
Power department has informed all consumers under Nito Farm sub-station 66/33/11kV, that there will be power shutdown on September 13 and 14 from 8 a.m. to 3 p.m. (daily) for stringing of 66kV line at Henivi village to facilitate National Highway four-lane.
Transmission division executive engineer sought the cooperation of all during the period.
