East Dimapur Sumi Students’ Union (EDSU) has reiterated its demand for construction of suspension/temporary bridge on the location of Old Dhansiri Bridge before the commencement of final examination of students.
In a press note EDSSU president, Kanato S. Awomi and general secretary, Ato Achumi, pointed out that a suspension bridge at 4th mile could be constructed within two months after the collapse of the old bridge whereas, the ongoing construction of bridge at Old Dhansiri River for last 8-9 months have even failed to erect suspension bridge.
The student body stated that closing down of the Old Dhansiri Bridge has caused immense suffering to students and public due to heavy traffic which has also resulted in missing examinations by students and job aspirants.
EDSSU also claimed that the temporary bridge meant for telecom cable was on the verge of collapsing and that it was highly unsafe. It warned that the responsible department and contractor would be held responsible for any accident.
In this regard, EDSSU has asked the responsible department and contractor to construct the suspension bridge immediately for the safety of the students and public.
